Watch Video Specific Aspects: A large section of massive sandstone had become loose and fell over 100m below the walking track. However a further 100m3 of boulder remained hung up on or above the public walk way. Spec Geo was commissioned to implement a solution and follow through with the removal of remaining blocks by use of drilling and blasting. A final ripe access groom of face ensured that the area was free of rock fall risk.
Access to site: 20min climb in and out via rope access.
Read More